• 2018“我们的中国梦”文化进万家活动在兰考启动 2019-10-17
  • 【今日之星】李宝:立志做大国工匠 2019-10-17
  • 手工红薯粉丝 ——舌尖上的年味与乡愁文章中国国家地理网 2019-10-08
  • 单眼皮泡泡眼女生看过来,你的眼妆应该要这样化! 2019-10-02
  • 太突然!华夏官方宣布主帅佩莱格里尼下课 2019-09-30
  • 在中国科学院第十九次院士大会、br中国工程院第十四次院士大会上的讲话 2019-09-30
  • 【端午节民俗地图】河南鲁山端午槲坠:深山槲叶悠悠香 2019-09-26
  • 一粒红枸杞 父子两代情 2019-09-26
  • 绿染江源,千湖归来——三江源生态保护建设取得阶段性成效 2019-09-23
  • 五八年的中国生产力和现在的生产力是一样的吗?脑子进水了。 2019-09-23
  • 中国量子雷达可从太空监视高速飞行器 2019-09-22
  • 【亲爱的同学,去相信,去仰视,向着梦想的方向。祝愿你收获最满意的高考结果,我们期待着,当八月荷塘花开,与你在清华园再次相遇】。。。【话外音;”理想“没有了,你就 2019-09-21
  • 不好意思了,忘记还有赌球一说。[哈哈] 2019-09-21
  • 迎泽大街下穿火车站通道顶进过半 2019-09-06
  • 我从工地捡了几块空心砖 摆在家里竟这么文艺! ——凤凰网房产 2019-08-23
  • The hydrogen sulphide cracking spent acid plant (the “Plant”) EPC contracted by YDIC for TianAn Chemical Co. Phosphate

    At 15:00pm on August 20th, 2018, the hydrogen sulphide cracking spent acid plant (the “Plant”) EPC contracted by YDIC for TianAn Chemical Co. Phosphate Fertilizer Manufacturing Center successfully passed the 72-hour performance test with 100% loading of both hydrogen sulphide and spent acid.

    The Plant uses hydrogen sulphide acid gas coming from the 500 tk/a Synthetic ammonia plant of TianAn Chemical Co. and alkylation spent acid supplied by Yunnan Petrochemcial Co., Ltd. as the raw materials to generate sulphur dioxide gas which is purified and dehumidified and then sent to the Phase I and II 800 kt/a sulphuric acid plant to produce sulphuric acid.

    Construction of the Plant commenced on July 17th, 2015 and was completed on July 30th, 2017. The initial hot commissioning with hydrogen sulphide was successfully started on September 18th, 2016. On November 4th, 2016, the Plant passed the 72-hour performance test under the operation condition of using only hydrogen sulphide gas.

    Yunnan Petrochemical Co., Ltd. started to supply spent acid to TianAn Chemical Co. on November 7th, 2017, and the Plant has been in normal operation since then. To test the Plant’s production capacity using both hydrogen sulphide and spent acid, TianAn Chemical Co. decided to conduct the 72-hour performance test with 100% loading of both hydrogen sulphide and spent acid during the period of 15:00pm on August 17th to 15:00pm on August 20th, 2018. During the performance test period, the Plant processed hydrogen sulphide acid gas at 3,440 m3/hr and spent acid at 2 m3/hr, which was the first time full capacity production with 100% loading of both materials. With the successful completion of 72-hour performance test, the Plant is proved to have reached its design requirements in terms of all indexes. The Plant is formally put into normal production since 15:00pm on August 20th, 2018.


    2018-09-17 140
    1
    Yunnan Design Institute of Chemical Engineering Co., Ltd.2018 ALL RIGHTS RSERVED
  • 2018“我们的中国梦”文化进万家活动在兰考启动 2019-10-17
  • 【今日之星】李宝:立志做大国工匠 2019-10-17
  • 手工红薯粉丝 ——舌尖上的年味与乡愁文章中国国家地理网 2019-10-08
  • 单眼皮泡泡眼女生看过来,你的眼妆应该要这样化! 2019-10-02
  • 太突然!华夏官方宣布主帅佩莱格里尼下课 2019-09-30
  • 在中国科学院第十九次院士大会、br中国工程院第十四次院士大会上的讲话 2019-09-30
  • 【端午节民俗地图】河南鲁山端午槲坠:深山槲叶悠悠香 2019-09-26
  • 一粒红枸杞 父子两代情 2019-09-26
  • 绿染江源,千湖归来——三江源生态保护建设取得阶段性成效 2019-09-23
  • 五八年的中国生产力和现在的生产力是一样的吗?脑子进水了。 2019-09-23
  • 中国量子雷达可从太空监视高速飞行器 2019-09-22
  • 【亲爱的同学,去相信,去仰视,向着梦想的方向。祝愿你收获最满意的高考结果,我们期待着,当八月荷塘花开,与你在清华园再次相遇】。。。【话外音;”理想“没有了,你就 2019-09-21
  • 不好意思了,忘记还有赌球一说。[哈哈] 2019-09-21
  • 迎泽大街下穿火车站通道顶进过半 2019-09-06
  • 我从工地捡了几块空心砖 摆在家里竟这么文艺! ——凤凰网房产 2019-08-23
  • 天津十一选五前三走势 广东快乐10分历史开奖结果查询 cba历年总冠军球队 2010彩票走势图 七星彩近十期开奖号码 急速赛车手演员 年全年特码资料 新疆时时开奖结果 千里马计划 黄金董孤胆码计划软件 江苏e球彩开奖结果走势图 三肖中特期期免费公开 重庆百变王牌基本走势图 贵州快3走势图 黑龙江36选7顺序号